Many homeowners dream of having a pool without the full commitment of a complete in ground installation, and learning how to put above ground pool partially in ground offers an excellent compromise. This approach allows you to enjoy the presence and accessibility of a pool while mitigating some of the classic challenges of traditional above ground models. By strategically burying a portion of the wall, you create a more integrated look that resembles a custom concrete pool, which can significantly boost your outdoor space's aesthetic appeal. This method also provides better access to the controls and equipment compared to a fully submerged design, making maintenance more convenient over the long term.
The process essentially involves excavating a trench around the perimeter of the pool wall and lowering the structure into the ground so that the wall sits partially buried. This hybrid design effectively increases the perceived size of the pool, giving it a grander presence in the yard. It also allows you to position the top edge of the wall at a comfortable height for sitting or entering and exiting, addressing ergonomic concerns. Homeowners frequently choose this option when they want a larger water capacity than a standard above ground model but are not ready for the high cost and permanence of concrete.
Planning and Site Selection
Before you even think about purchasing a pool, careful planning is essential to ensure the success of a partial burial project. You must evaluate the soil conditions at your site, as rocky or heavily clay-based terrain can make excavation extremely difficult and may require specialized equipment. It is also critical to check local building codes and homeowner association rules, as they may dictate minimum burial depths or specific safety requirements for pool barriers. Selecting a location with ample sunlight and away from large trees is vital to reduce debris and root intrusion into the pool structure and surrounding area.
Safety must be a primary consideration during the planning phase, particularly regarding underground utilities. Contact your local utility locating service to mark all buried gas, electric, and water lines before you dig any trenches. You will need to plan for a secure fence that complies with local regulations, ensuring that the access gate is self-closing and latching. Proper drainage is another crucial element; the site should be graded so that water flows away from the pool structure to prevent wall damage and foundation instability over time.
Choosing the Right Pool Kit
Not all above ground pools are suitable for partial burial, so selecting the correct kit is the first technical step in this process. You should look for models with robust steel or aluminum walls that are specifically rated for in ground or partially in ground applications. Round or oval shapes are the most common and structurally sound choices for this type of installation, as they distribute ground pressure evenly across the surface. Avoid kits that are explicitly labeled as "above ground only," as their panels and supports may not withstand the lateral forces of buried earth.
When reviewing specifications, pay close attention to the wall height and the recommended burial depth outlined by the manufacturer. Typically, you will bury between 12 to 18 inches of the wall, though this varies based on the model and climate. The liner size is also a critical factor, as a partial burial often requires a specific liner panel configuration to ensure a proper fit once the walls are set. Taking precise measurements and confirming compatibility with your chosen kit will prevent significant headaches during the installation stage.
Tools and Equipment Needed
Gathering the right tools is essential for a smooth installation, as this project relies heavily on precision and manual labor. You will need a sturdy digging bar or post-hole digger, a rotary tiller for breaking up compacted soil, and a sturdy shovel for general excavation. A level is absolutely necessary to ensure the wall is perfectly straight as you backfill, and a tamper or plate compactor will help you stabilize the base to prevent future sinking. Safety gear, including gloves, safety glasses, and steel-toed boots, should be worn at all times to protect against injury.
Additional equipment includes a tape measure, a carpenter's square, and a string line to maintain consistent wall alignment. You will also need a section of 2x4 lumber to brace the wall during the backfilling process. Having a helper is highly recommended, as managing the weight of the wall panels and the pressure of the excavated soil is a two-person job. With the right preparation and tools, you can create a stable and professional-looking installation that will last for years.
Excavation and Base Preparation
With the site selected and the kit delivered, the next phase involves clearing the area and preparing a solid base for the pool. This step is arguably the most labor-intensive, as you must dig a trench that follows the exact perimeter of the pool wall. The trench should be dug to the specified burial depth, usually around 12 to 18 inches, and it should be wide enough to allow you to comfortably work and place gravel backfill. Removing grass, roots, and rocks from the trench ensures a clean surface for the wall to rest on and prevents sharp objects from puncturing the liner.
Once the trench is dug, you need to compact the bottom to create a stable foundation. A firm base prevents the wall from bowing or shifting under the pressure of the water and the surrounding soil. It is a good practice to lay a layer of crushed stone or gravel in the bottom of the trench to aid in drainage and provide a consistent bedding surface. Taking the time to ensure the base is level and compacted will prevent uneven settling and potential structural stress on the pool walls after installation.
Installing the Wall Panels
With the base prepared, you can begin erecting the wall panels, which requires careful alignment and teamwork. Stand the first panel in the corner of your excavation and use a level to ensure it is perfectly plumb on both sides. Temporarily brace the panel with stakes and wood to hold it in place while you interlock the subsequent panels along the trench. It is crucial to connect the panels tightly according to the manufacturer's instructions to create a rigid, cohesive structure that can withstand the pressure of the earth.
As you move around the pool, continuously check for proper alignment and ensure the wall maintains a consistent vertical position. Any deviation at this stage will be magnified later when you add the liner and water. Once the full wall ring is assembled, you will essentially have a large above ground pool frame that is partially sunk into the earth, ready for the final stages of backfilling and finishing.
Backfilling and Bracing
Backfilling is the process of returning the excavated soil into the trench around the pool wall, and it must be done methodically to avoid damaging the structure. Start by adding a few inches of gravel or small stones into the trench behind the wall to promote drainage and prevent soil from pushing against the panels. Then, begin shoveling the native soil back into the void, packing it down firmly with a tamper as you go. This compaction is essential for removing air pockets and ensuring that the wall does not float or shift when the pool is filled with water.
During the backfilling process, you must brace the wall to counteract the immense pressure of the surrounding earth. Use the 2x4 lumber to push against the top of the wall and secure it to your stakes or other solid anchors. This bracing ensures the wall remains vertical and straight as you compact the soil. Continue alternating between adding soil, compacting it, and checking the level until the trench is filled and the wall is securely anchored in place.
Final Assembly and Liner Installation
With the wall fully installed and braised, you can move on to the final assembly of the pool equipment and the installation of the liner. This is the stage where the pool begins to take its true form, as the liner defines the shape and holds the water. Carefully unfold the liner and align it over the pool frame, ensuring that the overlap is even on all sides. Smooth out as many wrinkles as possible by hand, as excessive folds can lead to tearing or uneven water pressure on the walls.
Next, you will secure the liner to the top of the pool wall using a pool wall clip or the specific locking mechanism provided with your kit. This step locks the liner in place, preventing it from sliding inside the pool as it fills. Before you begin filling the pool, double-check that the liner is properly aligned and that the top edge of the pool wall is level. Any tilt at this stage will result in an uneven water line and difficulty in securing the coping or deck edging.
Filling and Initial Checks
Once the liner is secured, you can begin filling the pool with water using a garden hose. As the pool fills, carefully monitor the liner to ensure it is pulling into place smoothly without any snagging or new wrinkles forming. It is normal for the liner to make cracking or popping noises as it stretches over the frame, but loud tearing sounds indicate a problem that requires you to stop the fill immediately. Partially burying the pool allows the walls to remain rigid during this process, reducing the risk of collapse that a completely empty above ground pool faces.
While the pool fills, take the opportunity to check the structure for any signs of stress or movement. Look for gaps between the liner and the wall, and verify that the bracing you installed is still holding the wall true. You may need to make minor adjustments to the liner or add more backfill around the base. Once the pool is full, allow the water to sit for 24 hours so the liner can fully conform to the shape of the pool and the walls can settle into the final position.
Coping, Decks, and Landscaping
After the pool has settled, the final step is to install the coping and surrounding deck or patio surface. Coping is the cap that runs along the top edge of the pool wall, and it serves both an aesthetic and functional purpose by providing a place to sit and helping to secure the liner. You can use pressure-treated wood, composite decking, or concrete pavers for the deck surface, ensuring that it slopes away from the pool to promote proper drainage. Landscaping elements like rocks, plants, and pathway pavers can then be added to integrate the pool seamlessly into your yard design.
At this point, you should also install any additional features such as a pump, filter system, and ladder, ensuring they are all properly grounded and weatherproofed. Regular maintenance will include balancing the water chemistry, cleaning the filter, and inspecting the wall for any signs of wear on the liner. By treating your partially buried pool with the same care as a traditional in ground pool, you ensure its longevity and continued enjoyment. Following these detailed steps allows you to create a stunning and functional pool area that enhances your property and provides endless summer memories.